Jean Steckle PS was closed today as a result of a flood.

A pipe in a drinking fountain on the second floor of the school started leaking, which resulted in two to three inches of water in the hall, ceiling tiles and some classrooms. When the situation was assessed this morning, the extent of the water’s travel and pooling was unknown and the lack of available running water, Board staff made the decision to close the school. Clean up is on going at the school and the school will be open on Monday.